Exclusive & Premium Footwear - Unmatched Quality for Every Step!
Exclusive & Premium Footwear - Unmatched Quality for Every Step! Exclusive & Premium Footwear - Unmatched Quality for Every Step!
Home Loafers Comfortable Loafers
B.AIR BIRD STRAP WASH STRAP WBS-AS-M Woodwind Instrument

B.AIR BIRD STRAP WASH STRAP WBS-AS-M Woodwind Instrument

$ 31.57

$ 0.00

Save: $

Title:
  • DefaultTitle
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

B.AIR BIRD STRAP WASH STRAP WBS-AS-M Woodwind Instrument

  • "BIRD STRAP" aims to reduce the burden of the player, and improve the bling.
  • Washable Can be washed repeatedly, so you can use it without worrying about stains or odors.
  • The bird strap is designed to not compress your neck so it reduces strain and allows you to breathe into your instrument more smoothly.
  • Neck pad: Standard / V-plate : Standard / Hook: Snap hook / Size: M (20.9 inches / 53 cm)
  • Product Contents: BIRD STRAP WBS-ASM (Instruction Manual / Wrench for Adjustment), Cleaning Cloth, Sakura Instrument Original Sticker

Product description

Washable Bird Strap
It can be washed repeatedly, so you can use it without worrying about stains or odors.

Reusable and washable pads.
Pursuing a shape and fit that reduces strain on the neck.
Thick standard pad with excellent cushioning.
There are 2 types of thin "slim pads" that are fitted to.

Blade clinch
Securely secures blade (string) with fastening screws
The original lacing hardware allows for easy disassembly and assembly with the included dedicated wrench.

V-shaped plate.
V-shaped adjustment plate prevents neck pressure and keeps players in the best position
There are three types of "Standard Plate" and "Wide Plate" and "Plastic Plate.

Hook
The snap hook comes standard with a vinyl tube to prevent the hook ring from wear out.


--- Size ---
Male 175cm Standard Weight
S (50cm): Soprano
M (53cm): Alto
L (60cm): tener.

Female 160cm Standard Weight
S (50cm): Soprano Alto
M (53cm): tenor
L (23.6 inches (60 cm)): Baritone.

The above are for reference only. Depending on your body shape and how to position your instrument, the above may not be the same as the above mentioned above.
In the style, fold the strap in 2 times and begin from the top of the pad to the hook tip.

Product Contents:
BIRD STRAP WBS-AS-M (Instruction Manual / Adjustment Wrench Included)
Cleaning cloth
Sakura Instrument Original Sticker

You May Also Like

Plunge V Neck Long Sexy Prom Dresses Formal Evening Dresses Green & Blue 2 Colors
Plunge V Neck Long Sexy Prom Dresses Formal Evening Dresses Green & Blue 2 Colors

$ 44.93

Save: $

BLU/RED Line Sticker
BLU/RED Line Sticker

$ 32.68

Save: $

Wide Mouth Round HDPE - 8 oz
Wide Mouth Round HDPE - 8 oz

$ 39.58

Save: $

Brave Rain Pants Waterproof
Brave Rain Pants Waterproof

$ 27.93

Save: $

Moto Mirror Oxford Mirror Diamond, Left
Moto Mirror Oxford Mirror Diamond, Left

$ 8.63

Save: $

Red V-neckline Floor Length Floral Lace-up Party Dress, Red Party Dress
Red V-neckline Floor Length Floral Lace-up Party Dress, Red Party Dress

$ 48.39

Save: $

Training Tip - #116 Pre-Hitch Training A Team
Training Tip - #116 Pre-Hitch Training A Team

$ 24.65

Save: $

Training Tip - #113 Carts and Carriages
Training Tip - #113 Carts and Carriages

$ 31.93

Save: $

Tumbledown - 9'
Tumbledown - 9'

$ 46.70

Save: $

Oxford Dual Density MTB Grips Grey
Oxford Dual Density MTB Grips Grey

$ 41.56

Save: $

Cart
Exclusive & Premium Footwear - Unmatched Quality for Every Step!
Your cart is currently empty.